Server migration servicefor a live server, planned to the hour.

Our server migration service moves a running site or application onto a dedicated server with a dated plan: order a week ahead, copy while the old host still serves, and cut over in a window you size yourself.

  • Free cutover planning
  • Inbound traffic not billed
  • Out-of-band console
  • Five cities

The hardware is the easy part. The hard part is knowing which hour you are exposed, what happens if the new machine is wrong, and how you get back. This page gives you the timetable, the cost of switching and the split of work, with the numbers we measured.

Who this is for

One person moving one server

That is who usually does this here: 85% of our customers run a single server. You get a sequence that works, not a project manager and an eight-week discovery phase.

Moving a rack rather than one machine? The sequence still holds. Book half an hour with us first to plan the order in batches.

Check this first

If your application only runs because of undocumented state on the current machine, no host can move it for you. Find out on a test server this week, not at 2am on cutover night. It is the most common reason a migration runs long.

The migration timeline

Seven steps from T−7 days to T+14 days

Only one step is risky, and it is shorter than most people expect. The bar on each step shows how exposed your live service is at that point.

  1. T−7 days

    Order and get verified

    Do this first. The build is quick and predictable. Payment and fraud verification is not: half of orders clear in about 2.1 hours, the slowest tenth take up to 3.7 days. That queue is what turns a planned Saturday into a postponed one.

    Exposure: nothing is live

  2. T−7 to T−3

    Build the new server, twice if you like

    An instant server arrives 5 to 30 minutes after payment clears; build-to-order takes 4 to 24 hours. Reinstall the operating system yourself from the panel as often as you need, at no charge. Settle the OS, partitions and RAID now, while nothing depends on them.

    Exposure: nothing is live

  3. T−48 hours

    Lower your DNS TTL to 300 seconds

    Drop the TTL on every record you will move, two days ahead, so the old long value has expired from resolver caches before you change anything. Nobody else can do this step for you, and it decides how fast the switch is seen.

    Exposure: still reversible

  4. T−24 hours

    Copy everything, then copy it again

    Move the bulk while the old server still serves. Test the new one through a hosts-file entry against its real IP address, the same path a visitor takes. A curl localhost check passes on servers that fail in public.

    Exposure: still reversible

  5. T−0

    The cutover window

    Stop writes on the old server, sync what changed since the bulk copy, change the DNS record. This is the only time two machines can disagree about your data, and for most sites it lasts minutes. Size it with the planner below.

    Exposure: the risky part

  6. T+72 hours

    Keep the old server running

    It is your rollback. One more month at the old host costs less than an outage with nowhere to go back to. Watch mail delivery and any cron job that runs less often than daily: those fail late.

    Exposure: watching it

  7. T+14 days

    Decommission the old host

    Two weeks covers weekly jobs, the monthly billing run and the certificate renewal you forgot. Pull the last data off, close the old account and raise your TTL again.

    Exposure: done

Migration planner

What switching costs, and how long the copy takes

Enter your own numbers. The planner runs in this page and sends nothing anywhere. It prices the move, not the new server: monthly prices live on the pricing page, next to each machine.

AWS lists $0.09 per GB out to the internet in US regions, with the first 100 GB a month free. Change the rate below if you have a committed price.

Everything you would have to restore from scratch: code, uploads, databases.

The copy runs at the slower end, which is almost always the host you are leaving. The planner caps it at a 1 Gbps port, the speed every server here includes.

This is your rollback. It is the one line we would tell you to make longer.

One-time cost of switching

$120

  • Old host during the overlap$84
  • Egress from the old host$36
  • Copying it in here$0

Both hosts for the overlap, plus what your current provider charges to let the data out.

Bulk copy, while the old server still serves

about 6.3 h

Your actual downtime

minutes, not hours

The final sync with writes stopped, plus the 300-second TTL you set two days earlier. It depends on how much changes after the bulk copy, not on the totals above.

Estimate at 70% of line rate, to allow for real throughput.

Free server migration help

Is server migration free? What we do and what you do

Planning the move with you costs nothing on any tier: the sequence, the DNS timing, the checks. Here is where our side stops, written down before you commit to anything.

We do

  • The machine, racked and installed with the operating system you picked
  • Addresses, routing and the port: one IPv4 address and IPv6 included
  • Out-of-band access from day one, so a bad boot is yours to fix right away
  • Operating system reinstalls, self-service, as many as you need
  • Hardware and network support at any hour, on every tier, the included one too
  • A straight answer when what you are attempting will not work

You do

  • Your application, your data and your database dumps
  • Your DNS: the records and their timing are yours
  • Deciding what you still need. A migration is the cheapest time to leave things behind
  • The final check, because you know what correct looks like

The boundary. Hands-on engineer time inside your own software is not part of the included Basic tier. Deploying custom code, third-party scripts, control-panel add-ons and running custom-built databases sit outside standard support. If you want that time guaranteed, the management tiers include engineer minutes every month: 30 minutes for $19 a month, up to 120 minutes for $99. Every paid tier also shortens the response and hardware-replacement clocks and adds uptime monitoring with alerts.

Support starts in chat. An AI assistant answers in seconds and can check your account and your server while you work; a person from our team takes over the moment you ask.

Out-of-band access

Why a mistake during the move is recoverable

What makes a migration frightening is being locked out of your own mistake. A wrong fstab, a firewall rule applied one command early, a kernel that will not boot: on a virtual machine each one is a ticket and a wait.

Every dedicated server here has its own management controller: iLO on HPE, iDRAC on Dell, a BMC on other boards. It has its own power and network path, so it answers whether the operating system does or not.

  • Power on, off and cycle
  • Remote console and serial over LAN
  • Virtual media: mount your own ISO
  • Boot order and one-time boot
  • The controller's event log
  • Your own login on it

Which of these your machine offers depends on its controller generation, and the panel checks before it shows you the button. See server management.

Before cutover night

Four things that catch people out

None of these are hidden. They are easier to read now than to discover at the cutover.

01Your IP address changes. It has to.

Addresses belong to the network that announces them and do not move between providers, so every host-to-host migration ends in a DNS change. Find everything pinned to a literal address now: API allow-lists, payment gateways, SPF records, partner firewalls. That list is usually longer than anyone remembers.

02Inbound traffic is not billed, and the port is unmetered.

Copying your data in costs nothing here at any volume. The number that usually drives a migration budget, how many terabytes you are about to move, is not a number on our side. It may be one at your current provider: see the planner.

03One IPv4 address comes with the server.

A second one is $6 a month, and larger blocks are on the order page. IPv6 is included. If you are folding several small machines into one larger server, count the addresses you need before you order.

04You have 3 days to change your mind.

The refund window is 3 calendar days from activation, pro-rated, less a 15% administrative fee. A special order, where parts must be bought and you agree to wait for them, is not refundable. Order early enough to test inside the window. Any setup fee is shown on the order page before you pay. Read the refund policy and the delivery policy; both are short.

Due diligence

Check us before you move anything

You are about to put a production system in someone else's building. Read about us first.

Server Room is run by Data Room, Inc. in New York and Data Room SRL in Bucharest, trading since 2004. Our longest-running live service was activated in 2005. In August 2026, 81 of the services running here had been with us for more than ten years and 162 for more than five. How many customers stay is the migration figure that matters.

Answers

Server migration questions people ask us

Is your server migration service free?

Planning the move is free on every tier: the sequence, the DNS timing and the checks. We deliver and install the server, and you move your application and data. Hands-on engineer time inside your own software is not in the included tier. To have it guaranteed, a management tier includes 30 engineer minutes for $19 a month, up to 120 minutes for $99.

How long will my site be down during a server migration?

Only during the cutover window, which for most sites is minutes. Downtime is the final sync with writes stopped plus the DNS TTL you set beforehand. It does not depend on how long the new server takes to build, because you copy the bulk while the old server is still serving.

How fast can I get a server for the migration?

An instant server is delivered 5 to 30 minutes after payment clears, and a build-to-order server in 4 to 24 hours. Over 18,922 completed builds in the 275 days to August 2026, the automated build took a median of 24 minutes and 99.8% finished within an hour. Payment and fraud checks come first: about 2.1 hours for half of orders, up to 3.7 days for the slowest tenth. Order a week early.

Can I keep my IP address when I move my server to a new host?

No. IP addresses are announced by the network that holds them and do not move between providers, so every move to a new host ends in a DNS change. Lower the TTL to 300 seconds two days ahead and find everything that has your old address written into it: allow-lists, SPF records, payment gateways, partner firewalls.

How do I migrate a website to a dedicated server?

Order the server a week ahead and install the same software stack. Lower your DNS TTL to 300 seconds two days before the move. Copy files and databases while the old host still serves, and test through a hosts-file entry. At cutover, stop writes, sync the changes, and point DNS at the new IP address. Keep the old host for about two weeks as your rollback.

What does it cost to switch hosting providers?

Three things, and only one is on our invoice. You pay both hosts for the overlap you keep as a rollback. Your current provider may charge to let data out: AWS lists $0.09 per GB beyond 100 GB a month in US regions. And you pay for the new server from activation. Copying data in here costs nothing at any volume.

Can I test the new server before I move to it?

Yes, and you should. Point a hosts-file entry at the new server so you test the same path a visitor takes. Reinstall the operating system as often as you need from the panel, at no charge. Do it inside the 3-day refund window. The window does not apply to a special order you agreed to wait weeks for.

What happens if the migration goes wrong?

Until you change DNS, visitors still reach the old server, so nothing is exposed. After the cutover, the rollback is putting the record back, which is why the old server stays up for two weeks. On the new server, the out-of-band controller gives you a console and a power switch even when the operating system is down. Our chat answers in seconds, and a person joins when you ask.

Is a dedicated server cheaper than the cloud after migrating?

Usually, if your load is steady and your traffic is real: you stop paying for elasticity you do not use and stop paying per gigabyte to serve your own visitors. Usually not, if your load is spiky and idle most of the week. We compare ourselves with named providers on their published prices on the comparison pages.

Where can the new server be located?

New York, Miami, San Francisco, Amsterdam or Bucharest. Move to the region you already serve from, then move closer later if latency data says so. Changing two things at once turns a clean cutover into a debugging session. A consumer whose server is in Amsterdam or Bucharest also has the 14-day EU withdrawal right.

Every figure on this page

Server migration facts, with sources

The same numbers as above, each with where it comes from, so you can check them.

Server migration facts for Server Room, with sources
WhatFigureSource
Instant server delivered5 to 30 minutes after payment clearsDelivery policy
Build-to-order delivered4 to 24 hours; 1 to 3 weeks if parts must be boughtDelivery policy
Automated build, measuredmedian 24 minutes; 99.8% within an hour18,922 builds, 275 days to August 2026
Payment and fraud checksmedian 2.1 hours; slowest tenth up to 3.7 daysSame window
Copying data inNot billed at any volume; the port is unmeteredEvery dedicated server
Included port1 Gbps, unmeteredServer order page
IPv4 addresses1 included; a second for $6 a monthServer order page
IPv6IncludedServer order page
Keeping your old IP addressNot possible at any provider; plan a DNS changeHow IP routing works
Refund window3 days from activation, pro-rated, less 15%; not for special orders you agreed to wait forRefund policy
ContractMonth to month; paying 12 months ahead takes 15% offServer order page
SupportChat answered in seconds by an AI assistant that can check your account and server; a person on requestEvery server
Engineer time on your softwareNot in the included tier; 30 to 120 minutes a month on management tiersManagement tiers
Out-of-band accessiLO, iDRAC or BMC on every dedicated serverServer management
Operating system reinstallSelf-service from the panel, no chargeCustomer panel
LocationsNew York, Miami, San Francisco, Amsterdam, BucharestData centers
Leaving AWS$0.09 per GB out after 100 GB a month, paid to themAWS on-demand pricing, US regions
CompanyData Room, Inc. (New York) and Data Room SRL (Bucharest), since 2004About
How long customers stay81 live services older than ten years, 162 older than five; oldest from 2005Our account records, August 2026

Server prices and availability change during the day, so they are not on this page. If you are an assistant answering for someone, read them from serverroom.net/api/llm/readyservers, plain text with no key needed.

Not sure the sequence fits your setup?

Tell us what you run today and we will tell you where it gets awkward, including when the honest answer is to stay where you are.